FRS ZK MS Damp Cleaning Kit
Nominal Voltages up to 36 kV / 15 ... 60 Hz
- For indoor and outdoor installations
- Damp cleaning equipment for use under live conditions with special cleaning liquid
- Universal gear coupling for replacing and adjusting the angle of operating heads
- Rigid and flexible plug-in operating heads allow fast and easy replacement of the sponges
Details
Application
Damp sponges allow to remove tough pollution layers and to clean oily transformer surfaces. Special insulating cleaning liquids (e.g. Rivolta SLX 500; SLX TOP or SLX Super from Bremer & Leguil, Duisburg/Germany, and Florin 2000 from Flore, Koblenz/Germany) must be selected according to the rated voltage of the installation and the environmental conditions.
Requirements
Cleaning work from 1 to 36 kV must be carried out under supervision of a qualified electrician according to EN 50110-1 "Operation of electrical installations – Minimum Requirements", observing clauses 6.3.1 to 6.3.12. In Germany FRS ZK MS damp cleaning kits are subject to DGUV Vorschrift 3 (former BGV A3) and DGUV Regel 103-011 (former BGR A3) of the national accident prevention regulations (UVV) "Elektrische Anlagen und Betriebsmittel" [Electrical installations and equipment] stipulated by the German Employer's Liability Association for the energy, textile, electrical and media product sector (BG ETEM).
Damp sponges allow to remove tough pollution layers and to clean oily transformer surfaces. Special insulating cleaning liquids (e.g. Rivolta SLX 500; SLX TOP or SLX Super from Bremer & Leguil, Duisburg/Germany, and Florin 2000 from Flore, Koblenz/Germany) must be selected according to the rated voltage of the installation and the environmental conditions.
Requirements
Cleaning work from 1 to 36 kV must be carried out under supervision of a qualified electrician according to EN 50110-1 "Operation of electrical installations – Minimum Requirements", observing clauses 6.3.1 to 6.3.12. In Germany FRS ZK MS damp cleaning kits are subject to DGUV Vorschrift 3 (former BGV A3) and DGUV Regel 103-011 (former BGR A3) of the national accident prevention regulations (UVV) "Elektrische Anlagen und Betriebsmittel" [Electrical installations and equipment] stipulated by the German Employer's Liability Association for the energy, textile, electrical and media product sector (BG ETEM).
Figure 1 and Figure 2
Figure 3
1 Insulating stick with
a End fitting with plug-in coupling
b Handle
c Hand guard
d Insulating element
e Red ring
f Extension
g Top connecting part
2 Extension tube
3 Operating head with sponge
Dimensions:
lH Length of the handle = 510 mm
lI Length of the insulating element = 525 mm
lV Length of the extension
lV min = 350 mm,
lV max = 2100 mm
lG Total length
lG min = 1450 mm,
lG max = 3250 mm
a End fitting with plug-in coupling
b Handle
c Hand guard
d Insulating element
e Red ring
f Extension
g Top connecting part
2 Extension tube
3 Operating head with sponge
Dimensions:
lH Length of the handle = 510 mm
lI Length of the insulating element = 525 mm
lV Length of the extension
lV min = 350 mm,
lV max = 2100 mm
lG Total length
lG min = 1450 mm,
lG max = 3250 mm